Hancock Coal Pty Ltd
Alpha Coal EIS
Volume 1 – Project Wide
- Table of Contents
- 00. Executive Summmary
- 01. Introduction
- 02. Description of the Project
- 03. Cumulative Impacts
- 04. EM Plan
- 05. Social Impact Management Plan
Volume 2 – Coal Mine
- Table of Contents
- 01. Introduction
- 02. Project Description
- 03. Climate
- 04. Geology
- 05. Soils
- 06. Land Use and Tenure
- 07. Landscape Character
- 08. Land Contamination
- 09. Terrestrial Ecology
- 10. Aquatic Ecology & Stygofauna
- 11. Surface Water
- 12. Groundwater
- 13. Air Quality
- 14. GHG & Climate Change
- 15. Noise and Vibration
- 16. Waste
- 17. Transport
- 18. Indigenous Cultural Heritage
- 19. Non Indigenous Cultural Heritage
- 20. Social
- 21. Health and Safety
- 22. Economics
- 23. Sustainability
- 24. Hazard and Risk
- 25. Decomissioning & Rehab
- 26. EM Plan
- 27. SIMP
Volume 3 – Railway Corridor
- Table of Contents
- 01. Introduction
- 02. Project Description
- 03. Climate and Climate Change
- 04. 04. Geology
- 05. Soils, Topography and Land Disturbance
- 06. Land Use and Tenure
- 07. Landscape Character
- 08. Land Contamination
- 09. Terrestrial Ecology
- 10. Aquatic Ecology
- 11. Surface Water
- 12. Groundwater
- 13. Air Quality
- 14. Greenhouse Gas Emissions
- 15. Noise and Vibration
- 16. Waste
- 17. Transport
- 18. Indigenous Cultural Heritage
- 19. Non-Indigenous Cultural Heritage
- 20. Social
- 21. Health and Safety
- 22. Economic Impact Assessment
- 23. Sustainability
- 24. Hazard and Risk
- 25. Decommisioning and Rehabilitation
- 26. Environmental Management Plan
- 27. Social Impact Management Plan
Volume 4 – Project Wide Appendices
- A Terms of Reference
- B Terms of Reference Cross-Reference Table
- C EPBC Report
- D Glossary Abbrev Units
- E Corporate Environmental Policy
- F List of Proponent Commitments
- G Cumulative Impacts
- H References
Volume 5 – Coal Mine Appendices
- A TOR Cross Reference
- B Study Team
- C Soils, Topography and Land Disturbance
- D Land Contamination
- E1 Flora and Fauna Assessment
- E2 Aquatic Ecology Assessment
- E3 Stygofauna Survey
- F1 Geomorphology Technical Report
- F2 Flooding Technical Report
- F3 Site Water Management System and Water Balance Technical Report
- F4 Surface Water Quality Technical Report
- G Groundwater
- H Air Quality Report
- I Noise and Vibration
- J1 Geochemical Report
- J2 Alpha Coal Tailings Storage Facility-Concept Design Report
- K Traffic Impact Assessment
- L Non Indigenous Cultural Heritage
- M Social
- N Economic Impact Study
- O Consultation
- P Environmental Management Plan
Volume 6 – Railway Corridor Appendices
- A TOR Cross Reference Table
- B Study Team
- C Climate and Climate Change and GHG
- D Geology and Groundwater
- E Soils and Contamination
- F1 Aquatic Ecology
- F2 Terrestrial Ecology
- G1 Surface Water Modelling Report
- G2 Surface Water Report
- H Air Quality
- I Noise and Vibration
- J Non-Indigenous Cultural Heritage
- K Social Impact Assessment
- L Economics
- M Consultation
- N Transport